Nationwide Removal Services

UAS has removed millions of square feet of asbestos flooring nationwide for schools, hospitals, shopping centers and government agencies. As a manufacturer of infrared equipment, UAS has the ability to provide enough machines to complete a project in a timely and cost-effective manner.

Tile Removal Process Tile Removal Process
The tiles are heated and removed in an intact and non-friable condition without traditional, old-fashioned abatement procedures. Here, the ATR 920 is removing 4 tiles per cycle.
Prepping Before Mastic Removal "Prepping" Before Mastic Removal
This process prepares the work area for mastic removal. Plastic sheeting is temporarily hung to protect the walls and fixtures during mastic removal.
Mastic/Adhesive Removal Process Mastic/Adhesive Removal Process
A removal solution and floor buffer are used to agitate and loosen the mastic without traditional abatement procedures. The adhesive slurry is then dried and bagged for proper disposal.
Completed Process Completed Project
UAS completed projects result in a clean, dry, mastic-free floor ready for the installation of new flooring materials (tile, sheet goods, carpet).

UAS Automation Systems, Inc.
1-800-969-8837